Commonplace Photo voltaic and Anne Arundel County Division of Public Works in Maryland have begun work to develop a photo voltaic mission offering clear power to Bureau of Utility Operations services. The methods will probably be positioned in Millersville and include a mix of 4 carports and 7 rooftop photo voltaic arrays, totaling 1.3 MW.
“This mission reveals that saving tax-payer cash and defending the atmosphere do not need to be mutually unique,” mentioned County Govt Steuart Pittman. “I’m proud that Anne Arundel County is a pacesetter in efforts to create inexpensive clear power options the place doable.”
The system is anticipated to cowl greater than 90% of the full annual electrical energy wants of the Bureau’s Advanced. Within the first 12 months of manufacturing, the mixed methods are predicted to generate 1,645 MWh of unpolluted electrical energy.
“This mission is crucial in serving to Maryland additional its place as a pacesetter within the nation’s clear power transition,” mentioned Daryl Pilon, director of enterprise growth for Commonplace Photo voltaic. “Working with native governments like Anne Arundel County to attain sustainable operations whereas saving cash is a elementary piece of our nation’s power answer. And, we’re significantly proud so as to add this mission to the corporate’s ever-expanding portfolio in our house state.”
The Anne Arundel County Division of Public Works photo voltaic mission is partially funded by a grant from Maryland Governor Hogan’s Power Water Infrastructure Program.
At the moment, Maryland’s Renewable Portfolio Requirements are on course to achieve 50% clear electrical energy by 2030 and 100% by 2040. This mission is one other step towards serving to the state obtain these bold targets.
Information merchandise from Commonplace Photo voltaic