Studying Time: 1 minutes
Shizen Vitality Inc. and Fixed Vitality held a ceremony to have fun the completion of a 999.5 kWp (DC) capability, Company PPA mannequin rooftop solar energy plant on the Thai subsidiary of Fuji Seal Worldwide Inc., a world packaging options firm.
On this venture, a rooftop C&I (Industrial & Industrial) solar energy plant was developed at Fuji Seal Packaging (Thailand) Co., Ltd. (Fuji Seal Packaging) who’s a number one producer of packaging in Thailand. This venture situated in Samut Sakhon, with a complete floor space of 4746 m2 will allow important energy value discount through the use of cost-competitive renewable vitality, and carbon dioxide emissions are anticipated to be diminished by roughly 721 tons a yr. EPC administration, asset administration in addition to O&M are performed and managed by Fixed Vitality.
Head of ASEAN Fuji Seal Worldwide, Mr. Takashi Yamamoto, commented, “I’m glad to succeed in right now to see the completion of photo voltaic system set up. I actually admire the massive assist from all workers at this manufacturing unit, Fixed Vitality, and Shizen Vitality for making the set up of this photo voltaic system a actuality.”
Franck Fixed, President of Fixed Vitality commented, “Due to nice assist from this manufacturing unit, EPC contractor, and Shizen Vitality as our companion, we got here to appreciate this completion of this photo voltaic system set up. We want to contribute additional to de-carbonization at Fuji Seal Worldwide.”
Masaya Hasegawa, Consultant Director, added, “Amongst many builders available in the market, we admire that Fuji Seal Worldwide chosen us as a companion. We’re glad that the set up of this photo voltaic system will result in decarbonization and contribute to the vitality transition.”
Associated