A captive renewable vitality plant should adhere to all banking necessities, together with signing a wheeling and banking settlement with the distribution licensee, in accordance with a latest determination by the Rajasthan Electrical energy Regulatory Fee (RERC).
Shree Cement has submitted a petition to do away with banking-related points with the RERC renewable vitality value laws.
The RERC (Phrases and Circumstances for Tariff Dedication from Renewable Vitality Sources) Laws, 2020, didn’t embrace the request to judge all vitality for banking, though it had not been injected into the grid.
Shree Cements has a contract demand of 9 MVA and plans to develop a co-located captive photo voltaic plant at its Jobner facility in Rajasthan. It argued {that a} captive co-located solar energy set up with a capability equal to 100% of the contracted demand was eligible for banking.
Nevertheless, Jaipur Vidyut Vitran Nigam (JVVNL) refused to supply the challenge a financing facility since captive photo voltaic vegetation which might be put in behind meters will not be eligible for it. It claims that the petitioner’s captive producing challenge, which might be delivering energy to the cement mill, wouldn’t be instantly linked to the grid.
The distribution firm (DISCOM) additional said that if the challenge was better than 1 MW with out open entry, the petitioner wouldn’t be capable to provide energy into the system. In consequence, the generator was unable to make any claims for clarification alleviation below the renewable vitality requirements whereas it was not pushing for open entry.
The DISCOM added that the legal guidelines referred to as for a captive renewable vitality plant to provide the system with all of its vitality, whether or not it’s co-located or located exterior.
Additional, such a buyer can be required to signal a banking and wheeling contract. Searching for a brand new strategy to enter vitality into the grid by eliminating obstacles amounted to an abuse of the authorized system.
The Fee famous that the challenge being erected and co-located behind the meter was protected by legal guidelines governing renewable vitality.
In response to the circumstances outlined within the banking provisions, the state Fee famous that no banking facility might be permitted for renewable vitality initiatives that provide energy to a 3rd social gathering below open entry or for consumption from initiatives put in behind the meter and not using a bi-directional meter in the identical premises.
The Fee mentioned that in an effort to use the banking facility, a captive renewable vitality challenge should adjust to all of the phrases and circumstances of banking outlined within the wheeling and banking settlement with the distribution licensee, whether or not it’s co-located behind the meter or not.