Interconnection can decide whether or not your mission is ready to transfer ahead or not. Sadly, the method by which you join a PV mission to the grid may be unnecessarily advanced with out constant parameters. Plus, even seemingly small modifications from website to website — such because the distinctive structure of {the electrical} room — can change the interconnection procedures.
Balancing website situations with the system you need to set up is the magic. To assist tackle a number of the most typical considerations, we’ve included 5 of essentially the most continuously requested interconnection questions beneath.
Ought to I do a provide facet faucet or a load facet interconnection?
At PVComplete, we all the time advocate a load facet connection when attainable. A load facet connection signifies that you interconnect on the load facet of the service disconnect, resembling on a devoted PV breaker on the finish of the bus. Sadly, there are various conditions when a load facet connection will not be attainable. For instance, when there’s not bodily sufficient house so as to add an additional breaker to the panel.
Additionally, the NEC has a rule, colloquially known as the “120 % rule,” that claims the sum of the primary breaker plus 125 % of all energy supply(s) present (inverters) to a panel can’t exceed 120 % of the score of the panel bus, assuming the interconnection is on the reverse finish of the bus from the utility service. For instance, you probably have a 400A-rated panel with a 400A important utility feed breaker, then the photo voltaic inverter max present can’t be rated larger than 64A.
400A + 64A x 125% ≤ 400A x 120%
If you end up bumping up towards the 120 % rule, one choice to think about is changing the primary breaker with a lower-rated breaker. A load examine must be carried out first to find out if the demand is low sufficient to justify decreasing the primary breaker score. For instance, if you wish to join a photo voltaic inverter that has a 100A max output to a 400A panel with a 400A important breaker, you possibly can substitute the 400A important breaker with a 350A important breaker.
350A + 100A x 125% ≤ 400A x 120%
An alternative choice is to do a service swap. You probably have {an electrical} service and don’t need to improve your service, you possibly can swap out the primary service panel for a “photo voltaic prepared” mixture service entrance machine (CSED) that has a separate breaker connection for photo voltaic. For a typical 200A service, you possibly can interconnect as much as a 16-kW photo voltaic inverter.
The ultimate choice is to do a provide facet faucet. This entails intercepting and tapping into the conductors in between the utility provide and the primary breaker panel. With a provide facet faucet, you don’t want to think about the 120 % rule and may join inverters which might be rated as much as the score of the utility provide to the panel.


What’s the most important photo voltaic system I can placed on this panel?
The most important photo voltaic array that may be interconnected on a panel is a perform of the rated output present of the inverters. For instance, if you’re utilizing a 10-kW photo voltaic inverter with a rated output present of 40A, the NEC code requires you dimension the breaker at 125 % of the output present score, or 50A, since photo voltaic is taken into account a “steady” supply of present.
As mentioned earlier, this inverter would match on the load facet of a 400A panel. On this case, are we subsequently restricted to a 10-kW photo voltaic array? No, we aren’t.
Remember that you possibly can typically dimension the dc capability of a photo voltaic array to be bigger than the ac score of the photo voltaic inverter. That is known as the dc:ac ratio. It’s not unusual to see actual world dc:ac ratios between 1.2 and 1.5. Larger dc:ac ratios will overload the inverter in the midst of the day throughout sunny summer time months. The inverter will defend itself and restrict its energy to the rated energy of the inverter. This introduces clipping losses, which can be thought-about acceptable losses with a view to hit a goal system capability, illustrated in Fig 2 beneath. For instance, you possibly can join a 14-kW dc rated photo voltaic array to the 10-kW inverter if the modeled power losses are acceptable.


Word that within the non-summer months or on cloudy or wet days you won’t lose any power to clipping losses. Use the next desk to find out the utmost ac score of the inverter after which resolve on a suitable dc:ac ratio:


I’ve multiple meter, what do I do?
Fortuitously, we now have applications that permit for digital internet metering. This implies you possibly can bodily join your photo voltaic output to 1 meter and have the utility credit score the ability you generate to different meters that you simply personal. It’s like you’re nearly linked to the opposite meter with out having to really feed energy by means of it.
Word that there are limitations to those applications that modify relying in your state and utility supplier. For instance, in California, now we have each VNEM and NEMA applications with barely totally different guidelines as mentioned beneath.
What’s the distinction between VNEM and NEMA?
NEM aggregation, or NEMA, is a sub-schedule to the NEM tariff and is meant to be used when a buyer has a number of electrical meters on the identical property or on contiguous properties (i.e. properties that share a boundary). For instance, a farmer who operates a number of metered wells on a number of properties would fall into this class.
Digital internet power metering, or VNEM, is just like NEMA, however designed for a number of prospects situated at a single service. For instance, an condominium constructing that has a number of meters for every unit can be properly suited to VNEM. Below the VNEM umbrella, there are a number of particular applications relying in your state. In California, they’ve the next applications:
- Customary NEM2V
- NEM2VMASH, which is designed to work with the Multifamily Inexpensive Photo voltaic Housing (MASH) incentive program and the New Photo voltaic Properties Partnership incentive program; and
- NEM2VSOM, which is designed to work with the Photo voltaic on Multifamily Inexpensive Housing (SOMAH) incentive.
My buyer is apprehensive about public security energy shutoffs and brown outs — what do I do?


Fortuitously, there are actually a number of choices for including battery backup to your photo voltaic mission. Tesla is the most effective identified however there are dozens of different choices with varied battery chemistries. We usually advocate working with a photo voltaic inverter or energy electronics vendor that has the choice of battery storage constructed into their system. This may assist guarantee a seamless integration with the photo voltaic array. There are numerous choices accessible now together with Blue Planet Vitality, Enphase, Generac, Outback, SimpliPhi Energy and SolarEdge to call a number of.
Take a look at Photo voltaic Builder’s Vitality Storage System Purchaser’s Information for choices.
Reuben Baril is the director of design providers at photo voltaic design software program firm PVComplete, which supplies engineering providers in assist of a variety of residential, business and utility-scale photo voltaic initiatives. His mixed mechanical and electrical engineering background informs his distinctive photo voltaic and storage perspective.