Friday, March 31, 2023
  • Contact
  • Privacy Policy
  • Terms and Conditions
Solar News
  • Solar News
  • Manufacturing
  • Commercial
  • Residential
  • Policy
  • Community solar
  • More
    • Utility
    • Storage
    • Installation
    • Solar Guide
  • Solar Companies
    • Add Listing
No Result
View All Result
Solar News
No Result
View All Result
Home Solar News

Guzman Energy’s Garnet Mesa Solar farm project approved by Colorado county board

August 28, 2022
in Solar News
0
Guzman Energy’s Garnet Mesa Solar farm project approved by Colorado county board
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter
By SB Employees August 24, 2022

Guzman Energy has acquired approval from the Delta County Board of Commissioners for a restricted use allow required to put in and function the proposed Garnet Mesa Photo voltaic challenge in Southern Delta County, Colorado. The Commissioners voted unanimously to approve the allow on the August 16, 2022 Commissioners assembly.

When full, Garnet Mesa Photo voltaic will produce greater than 194,000 MWh of electrical energy every year, sufficient vitality for 18,000 properties. Delta-Montrose Electrical Affiliation (DMEA) will immediately buy a portion of the vitality produced by the photo voltaic farm and Guzman Power will offtake the remaining as energy provide to serve further wholesale clients.

Related posts

iSun wins $10 million in solar projects in New England

iSun wins $10 million in solar projects in New England

March 31, 2023
China encourages to build solar plants on land with low ecological value

China encourages to build solar plants on land with low ecological value

March 31, 2023

“We’re thrilled with the Delta County Board of Commissioners unanimous determination to approve the restricted use allow to put in and function the Garnet Mesa Photo voltaic challenge. We’re grateful for the time and a spotlight the group and County officers gave to the method,” mentioned Robin Lunt, Chief Technique Officer, Guzman Power.

The Garnet Mesa Photo voltaic challenge workforce will now concentrate on the following phases of engineering and procurement planning. Building useful resource and timing particulars will likely be introduced following these engineering and procurement planning cycles. The land secured for Garnet Mesa Photo voltaic farm development is at the moment irrigated and utilized for grazing, and can proceed for use in that method.

See also  GreenGo to develop 4GW energy park in Denmark

Highlights of the Garnet Mesa Photo voltaic farm embody:

  • Building labor head depend of 350-400
  • Property tax estimate of $13 million over 15 years
  • Helps DMEA attain roughly 20% native energy era
  • Maintains group dedication to agricultural land use by means of the simultaneous use of land for each solar energy era and agriculture by using roughly 1,000 sheep for grazing and vegetation administration on the photo voltaic farm

“We’re assured Garnet Mesa Photo voltaic will likely be a premier instance of agriculture and vitality co-existing collectively,” states Kent Blackwell, Interim CEO and Chief Expertise Officer, DMEA.

The Garnet Mesa Photo voltaic challenge workforce is comprised of Guzman Power, DMEA and Citra Energy. The Citra workforce has vital experience in renewable vitality improvement, technical engineering, EPC administration and oversight, challenge and portfolio acquisitions, and wholesale energy procurement. Collectively, the Citra workforce has labored on hundreds of Megawatts of now-operational wind, photo voltaic and vitality storage initiatives.

Have you ever checked out our YouTube web page?

Now we have a ton video interviews and extra content material on our YouTube web page. Lately we debuted Power Forward! — a collaboration with BayWa r.e. to debate larger degree business subjects in addition to finest practices / developments for operating a photo voltaic enterprise right this moment.

Our longer operating aspect challenge is The Pitch — by which now we have awkward discussions with photo voltaic producers and suppliers about their new expertise and concepts in order that you do not have to. We have discusses every part from residential rail-less deck attaching and home solar financing to large-scale energy storage value stacking and utility-driven new house solar + storage microgrids.

See also  Rollout solar racking collects rainwater, cuts land-use requirements – Commercial

We additionally publish our Project of the Year bulletins there! Interviews with this 12 months’s winners will likely be up beginning the week of Nov. 8. Head there and subscribe right this moment to remain on high of all this additional stuff.

Tags: utility-scale

Source link
Tags: approvedboardColoradoCountyEnergysfarmGarnetGuzmanMesaprojectsolar
Previous Post

Iberdrola working on 1.4GW of solar PV in Spain

Next Post

WBSEDCL Issues 10 MW Floating Solar Tender in West Bengal

Next Post
WBSEDCL Issues 10 MW Floating Solar Tender in West Bengal

WBSEDCL Issues 10 MW Floating Solar Tender in West Bengal

RECOMMENDED NEWS

Japan’s 13th solar auction concludes with lowest bid of $0.066/kWh – Commercial

Japan’s 13th solar auction concludes with lowest bid of $0.066/kWh – Commercial

7 months ago
GEC Working to Advance Decarbonization of Solar Panel Production

GEC Working to Advance Decarbonization of Solar Panel Production

1 week ago
Soltec partners with Endesa to build solar tracker factory in Spain

Soltec partners with Endesa to build solar tracker factory in Spain

4 months ago
DOE Issues RFI Related to $505 Million Energy Storage Infrastructure Initiative

DOE Issues RFI Related to $505 Million Energy Storage Infrastructure Initiative

9 months ago

BROWSE BY CATEGORIES

  • Commercial
  • Community solar
  • Installation
  • Manufacturing
  • Policy
  • Residential
  • Solar Guide
  • Solar News
  • Storage
  • Utility

BROWSE BY TOPICS

acquires Battery Billion build California Capacity clean Commercial community completes Construction Energy facility Green Grid home India launches manufacturing Market Million module modules Panel panels plant Policy portfolio Power Production program project projects Renewable Renewables Residential rooftop Signs solar storage supply system Systems Texas U.S

POPULAR NEWS

  • New micro-inverter series from China – Commercial

    New micro-inverter series from China – Commercial

    0 shares
    Share 0 Tweet 0
  • How to Plan Solar Panel Installation for your Home

    0 shares
    Share 0 Tweet 0
  • PV Price Watch: Polysilicon price finally levels off as top four silicon manufacturers post massive profit rises

    0 shares
    Share 0 Tweet 0
  • Leapton Solar Panels: Independent Review

    0 shares
    Share 0 Tweet 0
  • Exact Solar in Newtown, PA is Recognized as One of the 50 Most Community-Minded Employers in the Greater Philadelphia Region

    0 shares
    Share 0 Tweet 0

About

The mission of Solar News is to develop a community of people who try to make their life easy. The website strives to educate individuals in making wise choices about Solar Panels, Policy, Installation, Guides and more.

Follow us on social media:

Recent News

  • Duke Energy begins operating the largest battery system in North Carolina
  • iSun wins $10 million in solar projects in New England
  • TCL Zhonghuan targets 180GW wafer annual capacity this year

Category

  • Commercial
  • Community solar
  • Installation
  • Manufacturing
  • Policy
  • Residential
  • Solar Guide
  • Solar News
  • Storage
  • Utility

Newsletter

  • Contact
  • Privacy Policy
  • Terms and Conditions

© 2022 Solarnews - All rights reserved.

No Result
View All Result
  • Home
  • Solar News
  • Manufacturing
  • Commercial
  • Residential
  • Policy
  • Installation
  • Storage
  • Utility
  • Community solar
  • Solar Guide

© 2022 Solarnews - All rights reserved.